top of page

Northern School for Autism

Staged demolition of four school buildings, with controlled excavator works and separation of demolition waste.

Excavator demolishing school buildings at Northern School for Autism in Lalor, with demolition materials sorted for removal.

Rafferty the Wrecker undertook the demolition of Buildings A, D, E and F at Northern School for Autism in Lalor. The buildings comprised a mix of metal roofing, brick and timber walls, and timber floors.

Demolition was completed in a staged sequence using a 20–30 tonne excavator, removing each building section by section in a controlled manner. Materials were lowered to ground level, separated into their respective waste streams and progressively loaded out for removal. Works progressed through the site in the sequence of Block A, Block D, Block E and Block F, with the demolition methodology focused on maintaining structural stability throughout each stage.